97
4
OPERATION AND USE
id.:
DB 260 REV. 00 01/07/2015
4.10.4 CONCRETE COMPOSITION AND BATCHING TABLE
The volumes and/or weights of the individual components vary in relation to the breaking load and the product
characteristics, also considering practical experience.
The table below gives approximate values.
- Recommended operating cycle to produce workable concrete (
A
):
1
) Pump in about 80-90% of the total quantity of water.
2
) Add all the cement
3
) Add all the gravel
4
) Add all the sand
5
) Add the remaining percentage of water.
- Approximate mixing time: 4-5 minutes
- Approximate total cycle time (aggregate loading, adding water, mixing, unloading): 15 minutes.
FOR A YIELD OF 1 SQUARE METRE OF CONCRETE (approximate values)
TYPE OF CONCRETE OR
AGGREGATE
CEMENT
kg
AGGREGATE MIXTURE
GRAVEL m
3
SAND m
3
WATER
lt
STANDARD FOR FOUNDATIONS
150
0,80
0,40
100
200
0,80
0,40
120
200
0,80
0,40
120
250
0,80
0,40
140
300
0,80
0,40
150
300
0,80
0,40
150
350
0,80
0,40
160
(
A
) FOR OPERATIONS WITH
FORMWORKS
(
A
) REINFORCED CONCRETE,
IRON EXCLUDED
Содержание DB 260
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 22: ......
Страница 48: ...48 3 SAFETY PRECAUTIONS id DB 260 REV 00 01 07 2015 VEHICLE EXTERIOR ...
Страница 110: ......
Страница 166: ...166 TECHNICAL ANNEXES DB 260 REV 00 01 07 2015 id HYDRAULIC DIAGRAM ...
Страница 168: ......
Страница 174: ......
Страница 175: ...2013 04 08 00 02 0796 Catalog Section 78 PowerView Model PV101 C User s Guide Version3 2 ...
Страница 176: ......
Страница 183: ...00 02 0796 3 2013 04 08 Faceplate Features ...
Страница 221: ...00 02 0796 41 2013 04 08 NOTES ...
Страница 222: ...NOTES ...
Страница 223: ...NOTES ...
Страница 226: ...www fwmurphy com PV101 ...