![Festo SBO***-Q Series Скачать руководство пользователя страница 96](http://html1.mh-extra.com/html/festo/sbo-q-series/sbo-q-series_manual_2283437096.webp)
4. Commissioning
4-34
Festo P.BE-SBO-Q-EN en 1602e
Condition fulfilled
The camera image is evaluated, taking into account all
system parameters of the Free run mode:
– Start of image evaluation after cycle start
– Earliest start of output after cycle start
After output of the results of the check, camera images are
taken again until the conditions of the image-based trigger
are met again.
The system parameter “Start of image evaluation after cycle
start” influences the frame rate for analysis of the camera
images of the image-based trigger.
For quick reaction of the image-based trigger, put the
setting of this system parameter to “0”.
The process after a fulfilled trigger condition depends on the
system parameter “Image after fulfilled trigger condition”:
Setting
“Ongoing”
As long as the condition of the image-based trigger is ful
filled, the images are evaluated and the results output.
Setting
“Single image”
After successful evaluation of a image and output of the
corresponding results, camera images are taken again. But
these images are evaluated only when the conditions of the
image-based trigger are
not
fulfilled for at least 1 image.
Only then will just the first image that fulfills the conditions
of the trigger be evaluated.
The “Single image” setting ensures that the results for a part
are only output once, even if the part remains in front of the
Compact Vision System for an extended period and thus
again fulfills the conditions for the image-based trigger.
Содержание SBO***-Q Series
Страница 2: ......
Страница 19: ...System overview 1 1 Festo P BE SBO Q EN en 1602e Chapter 1 System overview...
Страница 39: ...Mounting 2 1 Festo P BE SBO Q EN en 1602e Chapter 2 Mounting...
Страница 47: ...Installation 3 1 Festo P BE SBO Q EN en 1602e Chapter 3 Installation...
Страница 62: ...3 Installation 3 16 Festo P BE SBO Q EN en 1602e...
Страница 63: ...Commissioning 4 1 Festo P BE SBO Q EN en 1602e Chapter 4 Commissioning...
Страница 162: ...4 Commissioning 4 100 Festo P BE SBO Q EN en 1602e Fig 4 34 Structure of an imported data type...
Страница 175: ...Diagnostics and error handling 5 1 Festo P BE SBO Q EN en 1602e Chapter 5 Diagnostics and error handling...
Страница 183: ...Technical appendix A 1 Festo P BE SBO Q EN en 1602e Appendix A Technical appendix...
Страница 247: ...Index B 1 Festo P BE SBO Q EN en 1602e Appendix B Index...
Страница 248: ...B Index B 2 Festo P BE SBO Q EN en 1602e Table of contents B Index B 1...