Contents and general safety instructions
XV
Festo P.BE-SBO-Q-EN en 1602e
Term/abbreviation
Meaning
Exposure time
The duration for which the CMOS sensor is subjected to light during
image capturing. The longer the exposure time, the more light will
penetrate. The exposure time is chosen on the basis of e.g. speed of
travel, amount of light available, and the light sensitivity of the
sensor (
è
Sensor amplification). In the case of moving objects, long
exposure times result in blurred images.
Falling edge
Transition from logic 1 to logic 0 (falling).
Feature(s)
Defined values (e.g. length) that are determined by the check pro
gram and used for analysis.
Fieldbus nodes
Provide the connection to specific fieldbuses. Transmit control sig
nals to the connected modules and monitor their ability to function.
Focal depth
è
Depth of focus
Focal length
Large focal lengths create a large image, while small focal lengths
create a wide-angle image. Lenses with variable focal lengths are
known as zoom lenses. Lenses with greater focal lengths usually
have a smaller depth of focus and a lower luminous intensity.
I
Digital input.
I module
Input module.
I/O modules
Collective term for the modules which provide digital inputs and
outputs (e.g. CPX I/O modules, CP input modules and CP output
modules).
I/Os
Digital inputs and outputs.
Logic 0
Input or output supplies 0 V.
Logic 1
Input or output supplies 24 V.
Modbus TCP
Communication standard via TCP/IP in automation technology.
O
Digital output.
O module
Output module.
PLC/IPC
Programmable logic controller/industrial PC
Rising edge
Transition from logic 0 to logic 1 (rising).
SBO-DeviceManager
Software package for adjusting the network properties and firm
ware.
Содержание SBO***-Q Series
Страница 2: ......
Страница 19: ...System overview 1 1 Festo P BE SBO Q EN en 1602e Chapter 1 System overview...
Страница 39: ...Mounting 2 1 Festo P BE SBO Q EN en 1602e Chapter 2 Mounting...
Страница 47: ...Installation 3 1 Festo P BE SBO Q EN en 1602e Chapter 3 Installation...
Страница 62: ...3 Installation 3 16 Festo P BE SBO Q EN en 1602e...
Страница 63: ...Commissioning 4 1 Festo P BE SBO Q EN en 1602e Chapter 4 Commissioning...
Страница 162: ...4 Commissioning 4 100 Festo P BE SBO Q EN en 1602e Fig 4 34 Structure of an imported data type...
Страница 175: ...Diagnostics and error handling 5 1 Festo P BE SBO Q EN en 1602e Chapter 5 Diagnostics and error handling...
Страница 183: ...Technical appendix A 1 Festo P BE SBO Q EN en 1602e Appendix A Technical appendix...
Страница 247: ...Index B 1 Festo P BE SBO Q EN en 1602e Appendix B Index...
Страница 248: ...B Index B 2 Festo P BE SBO Q EN en 1602e Table of contents B Index B 1...