GROWSPAN
™
ESTATE ELITE ATTACHED GREENHOUSES
4
Revision date: 01.01.16
Rafters
Base Rail
Diagonal
Strut
Vertical Support:
Sidewall
Gutter Rail
OVERVIEW
This section describes assembling your Elite greenhouse.
See illustration below to identify main parts of greenhouse.
1. Locate the required parts for each assembly procedure.
2. Preassemble the base frame, end walls and sidewalls.
3. Assemble the frame and install the ridge beam, rafters
and vents.
4. Square and anchor the greenhouse.
5. Assemble and install door.
6. Attach gutter rails ends.
7. Install the side, end and
roof polycarbonate panels.
8. Assemble and attach door,
door stops, down spouts, and
ridge beam end covers.
Ridge Beam
ATTENTION: TO AVOID TWISTING OFF OR DAMAGING
THE FASTENERS, DO NOT OVERTIGHTEN.
FOR YOUR CONVENIENCE, ADDITIONAL FASTENERS
CAN BE FOUND IN THE "EXTRA PARTS" BAG OR BOX.
REFER TO THE BILL OF MATERIALS FOR A LIST OF
THE FASTENERS CONTAINED IN THAT BAG OR BOX.
Actual strut position may
differ from what is shown
in this example.
GrowSpan
™
Estate Elite Attached
Greenhouses