Figure 3-39 Time measurement
8. Press
to start a time measurement test;
9. After the load detects the complete start signal and end signal, the time
measurement ends, the screen prompts “SUCCESS” and the measured time is
displayed in ms.
Notice: There is no direct relation between the turn-on of time measurement and
load input.
When measuring the external level, there is no need to set the start main value (Beg
LEVL) or the end main value (End LEVL), just select the level direction. The external level
input measurement port is shown in the figure below.
Figure 3-40 Time measurement for external level signal
3.29. Save and Recall
The load provides 20 groups of storage locations for users to save test function
parameters. The configuration parameters of each test function can be saved to the
Содержание FT68200 Series
Страница 9: ...Faithtech FT68200 Operation Manual 3 1 3 2 7U 8kW 10kW 12kW...
Страница 10: ...Faithtech FT68200 Operation Manual 4 1 3 3 11U 14kW 16kW 18kW...
Страница 11: ...Faithtech FT68200 Operation Manual 5 1 3 4 14U 20kW 22kW 24kW...
Страница 12: ...Faithtech FT68200 Operation Manual 6 1 3 5 20U 30kW 36kW...
Страница 13: ...Faithtech FT68200 Operation Manual 7 1 3 6 26U 42kW 48kW...
Страница 14: ...Faithtech FT68200 Operation Manual 8 1 3 7 32U 54kW 60kW...