30
4. Installation
DEPOLOX® 5 E flow cell
EN
4.15 Connecting sensors with
DFMe electronics module
1 Insert the multi-sensor (Fig. 10 - item A) in
the flow control valve (Fig. 10 - item B).
Fig. 10 DEPOLOX® 5 E flow cell, non-
pressurized
A Multi-sensor
B
Flow control valve
C
3-electrode measuring cell
D Cap
2 Connect sensor cable DFMe-DES (Fig. 13 -
item B) to the 3-electrode measuring cell
(Fig. 10 - item C). To do this, screw cap
(Fig. 10 - item D) on the 3-electrode mea-
suring cell (Fig. 10 - item C) counterclock-
wise up to the mark (Fig. 11 - item K) and
take it off. Feed the sensor cable through
the cap and tighten with the M12 cable
union (Fig. 11 - item L). Connect the signal
cable, observing the correct colors (Fig. 12
and lower table). Screw in the cap clock-
wise up to the mark.
Fig. 11 Detail: cap
Fig. 12 Section of 3-electrode measuring cell
3 Insert or screw the LED glow stick (Fig.
13 - item C) into the mounting hole in the
cell body cover.
4 Connect the pH- and redox sensor cable
plug (Fig. 13 - item D/E) with the pH and
redox combined measuring and reference
electrode.
5 Plug the CAN connection cable into the
CAN connection socket (Fig. 13 - item J)
and with connect with 700 P electronics
module or 700 M electronics module
(CAN socket).
A
B
C
D
WRK
Working electrode
(Fig. 12, item M)
Red
point
Red
cable
CNT
Counter electrode
(Fig. 12, item N)
Blue
point
Blue
cable
Ref
Reference electrode
(Fig. 12, item O)
White
cable
K
L
M
N
O