§5.7 Complete the wiring, continued
10. Loop a cable tie into the top of vertical slot in the EBB
Support, out of the highest horizontal slot, and around
the wrapped cable and support (
J
).
11. Cinch that cable tie very tight, to support the cable
guide vertically (
K
), and cut off the excess length (
L
).
J
K
L
67
Содержание AxiDraw MiniKit 2
Страница 5: ...Part 1 Tools 5...
Страница 8: ...Part 2 The Base 8...
Страница 20: ...Part 3 The X Carriage 20...
Страница 35: ...Part 4 Y Belt and Z 35...
Страница 55: ...Part 5 Servo and wiring 55...
Страница 72: ...Part 6 Using AxiDraw MiniKit 72...