Issue 4.5 Aug 2005
IntelliBell 14-3
I
NTELLI
B
ELL
O
VERVIEW
Function
The IntelliBell (IB) has been specifically developed by
Europlex to interface with its 3GS controller. The IB
connects to the data line and monitors the state of the
control line to determine the state of its outputs.
The unit activates its piezo sirens and/or strobe when
certain pre-programmed panel outputs are triggered.
A second model of the unit is available which
incorporates a Voice Annunciator Board (VAB) and
Speaker as an alternative to the sirens. A pre-recorded
message is replayed on activation of the VAB.
The unit has one on-board zone and reports tamper
alarms, self-test failures, detected foam ingress, and
drilling using this zone.
햲
Voice Annunciator Board (VAB) mounting holes
-
The Sounder facilitates speech replay via an optional
add-on Voice Annunciator Board (VAB) and Speaker.
The speaker replaces the piezo sirens and both it
and the VAB are factory installed. The pre-recorded
message is stored in memory.
햳
Foam ingress detect receiver
- To protect against
foam ingress, there are two infrared optical beams
on the board. If both beams are broken, a tamper
will be generated.
햴
Programming display
- See “Programming” on page
4-4.
햵
Foam ingress detect transmitters
- Use with the
foam ingress detect receivers.
햶
Sirens
- See wiring diagram overleaf.
햷
Battery
- See wiring diagram overleaf.
햸
Drill detect link
- See wiring diagram overleaf.
The unit has a drilling detect feature whereby the
presence of drilling is reported to the panel. This fea-
ture may be enabled by removing a
detect
link and
connecting a mass inertia sensor.
햹
Back tamper
- See wiring diagram overleaf.
햺
End-of-lines (EOLs)
- See wiring diagram overleaf.
햻
Xenon tube and system active LED
- See wiring dia-
gram overleaf.
햽
Programming keys.
햾
Data BUS
- See wiring diagram overleaf. Feed all
external cables (Data line, DC power, and so on)
through the cable entry grommet in the cabinet.
Connect Data, Control, and Ground to the IB as
illustrated in the diagram overleaf. Secondary power
is supplied via a NiaCad battery pack. Connect the
battery pack leads (red: batt+, black: batt-) after pri-
mary power has been applied. The System Active
LED should blink to indicate the unit is functioning
correctly.
Note
A maximum of 30m of alarm cable is
recommended between 3GS controller and IB. A higher
specification cable is recommended for distances
greater than 30m. LEM Ground should be connected to
COM
at the 3GS Controller.
햿
VAB connector
헀
Front tamper and skin tamper
- See wiring diagram
overleaf. There are two lever tamper switches on the
cabinet. If the double skin is punctured, a short
between both skins activates a tamper. An activation
of any tamper is reported to the panel using the on-
board zone. Remove the lid tamper switch transit
stop. Ensure that the tamper lever makes firm con-
tact with the wall when the unit is mounted.
Содержание 3GS
Страница 4: ...Introduction iv...
Страница 12: ...Introduction 8...
Страница 14: ...1...
Страница 18: ...System Overview 1 6...
Страница 20: ......
Страница 22: ...Hardware Overview 2 4 SYSTEM CONFIGURATION The following diagram shows a typical configuration of the system...
Страница 26: ......
Страница 34: ......
Страница 38: ...Intelligent PSUs 4 6...
Страница 40: ......
Страница 97: ...Issue 4 5 August 2005 Nodes 5 59...
Страница 98: ...Issue 4 5 August 2005 Nodes 5 61...
Страница 100: ......
Страница 106: ...3GS Technical Manual...
Страница 116: ...3GS Technical Manual 7 12 Programming Overview Issue 4 5 August 2005 3GS Initial Setup Menu...
Страница 118: ...3GS Technical Manual...
Страница 146: ...3GS Technical Manual Issue 4 5 August 2005 Programming Menus 8 31 Node Configure Inputs Menu...
Страница 153: ...3GS Technical Manual Issue 4 5 August 2005 8 38 Programming Menus Service Mode Test Menu...
Страница 155: ...3GS Technical Manual Issue 4 5 August 2005 8 40 Programming Menus Service Mode Monitor Menu...
Страница 217: ...3GS Technical Manual Issue 4 5 August 2005 8 108 Programming Menus...
Страница 218: ...3GS Technical Manual Issue 4 5 August 2005 Programming Menus 8 109...
Страница 220: ......
Страница 222: ...3GS Version 5 User Guide 9 5 3GS SYSTEM KEYPAD DISPLAY...
Страница 254: ...3GS Version 5 User Guide 9 37 Some examples of Alert Messages...
Страница 262: ...3GS Version 5 User Guide 9 45 User name max 24 characters User no 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32...
Страница 264: ......
Страница 265: ...I n t h i s c h a p t e r HHT Overview 10 3 Main Menu 10 5 HAND HELD TERMINAL HHT 10...
Страница 266: ......
Страница 280: ......
Страница 288: ......
Страница 290: ......
Страница 293: ...Issue 4 5 August 2005 DM1200 Digital Communicator Modem 12 5...
Страница 301: ...I n t h i s c h a p t e r Network Router Overview 13 3 Sample Connection Diagram Scenarios 13 4 NETWORK ROUTER 13...
Страница 302: ......
Страница 304: ...Network Router 13 4 SAMPLE CONNECTION DIAGRAM SCENARIOS...
Страница 308: ...Network Router 13 8...
Страница 310: ......
Страница 316: ...IntelliBell 14 8 SELF ACTIVATING BELL To connect a Self Activating Bell SAB to the 3GS system see the following diagram...
Страница 318: ......
Страница 338: ...Issue 4 5 August 2005 Technical Specifications 15 23...
Страница 339: ...I n t h i s c h a p t e r 3GS Overview 16 5 Installing 3GS 16 6 Installing the Dongle 16 7 Upgrading 16 8 16 PC SOFTWARE...
Страница 340: ...1...
Страница 346: ......
Страница 366: ...17 22...
Страница 367: ...I n t h i s c h a p t e r Introduction to CiTeC II 18 3 CITEC II INSTALLATION 18...
Страница 368: ......
Страница 370: ...CiTeC II Installation 18 4...
Страница 377: ...Issue 4 5 August 2005 19 7...
Страница 378: ...19 8...
Страница 385: ......
Страница 386: ......