ET 220I AC/DC
INSTALLATION, OPERATION AND SETUP
Manual 0-5346
3-32
Shutdown
Close cylinder valve whenever the regulator/ flowmeter is not in use. To shut down for extended periods (more than 30 minutes).
1. Close cylinder or upstream valve tightly.
2. Open downstream equipment valves to drain the lines. Bleed gas into a well ventilated area and away from any ignition source.
3. After gas is drained completely, disengage adjusting screw and close downstream equipment valves.
4. Before transporting cylinders that are not secured on a cart designed for such purposes, remove regulators/ flowmeters.
3.19 Foot Control, Part No. W4013200 (Optional Accessory)
Art # A-11338
Figure 3-22: Foot Control
Art # A-11339
1
2
3
4
5
6
7
8
Art # A-11340
Figure 3-23: 8 Pin Control Plug
Pin
Description
1
Not Used
2
Trigger Switch
3
Trigger Switch
4
Not Used
5
Potentiometer Maximum
6
Potentiometer Minimum
7
Potentiometer Wiper
8
Not Used
Table 3-11: 8 Pin Socket
Содержание ET 220i AC/DC
Страница 46: ...ET 220I AC DC INSTALLATION OPERATION AND SETUP Manual 0 5346 3 34 This Page Intentionally Blank...
Страница 68: ...ET 201I AC DC KEY SPARE PARTS 0 5346 6 2 6 01 Key Spare Parts A 12885_AB Figure 6 1 Spare Parts...
Страница 70: ...ET 201I AC DC KEY SPARE PARTS 0 5346 6 4 This Page Intentionally Blank...
Страница 73: ......