![ESAB ET 220i AC/DC Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/esab/et-220i-ac-dc/et-220i-ac-dc_operating-manual_2424782043.webp)
ET 220I AC/DC
Manual 0-5346
INSTALLATION, OPERATION AND SETUP
3-31
NOTE!
All valves downstream of the regulator/ flowmeter must be opened to obtain a true flow rate reading on the
outlet gauge. (Welding power source must be triggered) Close the valves after the pressure has been set.
Installation
1. Remove cylinder valve plastic dust seal. Clean the cylinder valve outlet of impurities that may clog orifices and damage seats
before connecting the regulator/ flowmeter.
Crack the valve (open then close) momentarily, pointing the outlet away from people and sources of ignition. Wipe with a clean
lint free cloth.
2. Match regulator/ flowmeter to cylinder. Before connecting, check that the regulator/ flowmeter label and cylinder marking
agree and that the regulator/ flowmeter inlet and cylinder outlet match. NEVER CONNECT a regulator/ flowmeter designed for a
particular gas or gases to a cylinder containing any other gas.
3. Connect the regulator/ flowmeter inlet connection to cylinder or pipeline and tighten it firmly but not excessively, with a suit-
able spanner.
4. Connect and tighten the outlet hose firmly and attach down-stream equipment.
5. To protect sensitive down-stream equipment a separate safety device may be necessary if the regulator/ flowmeter is not fit-
ted with a pressure relief device.
Operation
With the regulator/ flowmeter connected to cylinder or pipeline, and the adjustment screw/knob fully disengaged, pressurize as follows:
1. Stand to one side of regulator/ flowmeter and slowly open the cylinder valve. If opened quickly, a sudden pressure surge may
damage internal regulator/ flowmeter parts.
2. With valves on downstream equipment closed, adjust regulator/ flowmeter to approximate working pressure. It is recommend-
ed that testing for leaks at the regulator/ flowmeter connection points be carried out using a suitable leak detection solution or
soapy water.
3. Purge air or other unwanted welding grade shielding gas from equipment connected to the regulator/ flowmeter by individually
opening then closing the equipment control valves. Complete purging may take up to ten seconds or more, depending upon the
length and size of the hose being purged.
Adjusting Flow Rate
Figure 3-21: Adjust Flow Rate
With the regulator/ flowmeter ready for operation, adjust working flow rate as follows:
1. Slowly turn adjusting screw/knob in (clockwise) direction until the outlet gauge indicates the required flow rate.
NOTE!
It may be necessary to re-check the shielding gas regulator/ flowmeter flow rate following the first weld
sequence due to back pressure present within shielding gas hose assembly.
2. To reduce flow rate, allow the welding grade shielding gas to discharge from regulator/ flowmeter by opening the downstream
valve. Bleed welding grade shielding gas into a well ventilated area and away from any ignition source. Turn adjusting screw
counter clockwise, until the required flow rate is indicated on the gauge. Close downstream valve.
Содержание ET 220i AC/DC
Страница 46: ...ET 220I AC DC INSTALLATION OPERATION AND SETUP Manual 0 5346 3 34 This Page Intentionally Blank...
Страница 68: ...ET 201I AC DC KEY SPARE PARTS 0 5346 6 2 6 01 Key Spare Parts A 12885_AB Figure 6 1 Spare Parts...
Страница 70: ...ET 201I AC DC KEY SPARE PARTS 0 5346 6 4 This Page Intentionally Blank...
Страница 73: ......