![ESAB ET 220i AC/DC Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/esab/et-220i-ac-dc/et-220i-ac-dc_operating-manual_2424782041.webp)
ET 220I AC/DC
Manual 0-5346
INSTALLATION, OPERATION AND SETUP
3-29
Fan Test
• Press and hold the BACK button (22).
• Press the WELDING TYPE button (17).
• The fan will run for approximately 30 seconds.
• If the BACK button (22) and WELDING TYPE button (17) are pressed again while the fan is running, the fan test is halted.
Art # A-12855
T
4T
2T
Figure 3-18: Fan Test
Water Pump Test
Only for water pump with Net Connection interface
• Press and hold the FORWARD button (22).
• Press the WELDING TYPE button (17).
• The Water Cooler (Net Connection type) will run for approximately 30 seconds.
If there is an error, or no pump is connected, the error message
Will be displayed after approximately 5 seconds.
Art # A-12856
T
4T
2T
Figure 3-19: Water Pump Test
Содержание ET 220i AC/DC
Страница 46: ...ET 220I AC DC INSTALLATION OPERATION AND SETUP Manual 0 5346 3 34 This Page Intentionally Blank...
Страница 68: ...ET 201I AC DC KEY SPARE PARTS 0 5346 6 2 6 01 Key Spare Parts A 12885_AB Figure 6 1 Spare Parts...
Страница 70: ...ET 201I AC DC KEY SPARE PARTS 0 5346 6 4 This Page Intentionally Blank...
Страница 73: ......