EPSON Stylus
&2/25
800
Rev. A
3-18
3.10 Carriage Motor (CR Motor) Assembly Removal
1. Remove the upper housing. (See Section 3.4.)
2. Release the CR lock lever using tweezers. Then shift the CR assembly from the capping
position manually.
3. Remove 2 screws (CBS, 3x6, F/Zn) securing the CR motor assembly to the top frame. (See
Figure 3-19.)
4. Disengage the timing belt from the pinion gear.
5. Unlock CN12 on the C202 MAIN board by pulling up the lock lever. Then disconnect the CR
motor connector cable from CN12.
6. Remove the CR motor assembly from the printer mechanism.
❏
When mounting the CR motor assembly to the top frame, insert the CR motor cable
facing the bottom of the printer, and fit the CR motor assembly pins into the cutout in the
top frame.
❏
Tightening torque for the screws (CBS, 3x6, F/Zn) = 8 ~ 10 kg-cm.
Perform the Bi-d adjustment after reinstalling the CR motor assembly. See Chapter 4.
Timing Belt
Top Frame
CBS Screws (3X6, F/Zn)
Figure 3-19. Screws Securing the CR Motor Assembly
REQUIRED ADJUSTMENT
Содержание Stylus Color 800
Страница 1: ...EPSON COLOR INK JET PRINTER EPSON Stylus COLOR 800 SERVICE MANUAL SEIKO EPSON CORPORATION 4007371 ...
Страница 48: ......
Страница 56: ......
Страница 60: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 164: ......
Страница 173: ...EPSON Stylus 2 25 800 Rev A 6 6 Lubricate PF Roller Bushing 12 Figure 6 10 Lubrication Point 10 ...
Страница 184: ...Appendix Rev A A 9 A 3 Circuit Board Component Layout A 3 1 C202 MAIN Board Assembly Component Layout ...
Страница 185: ...EPSON Stylus 2 25 800 Rev A A 10 A 3 2 C202 PSB Board Assembly Layout A 3 3 C202 PSE Board Assembly Layout ...
Страница 187: ...EPSON SEIKO EPSON CORPORATION ...