EPSON Stylus
&2/25
800
Rev. A
3-24
❏
Follow the instructions below when installing the hopper assembly into the ASF frame
with
the paper loading assemblies mounted on it: (See Figure 3-29.)
1. Note the direction to place the compression spring. One end is bent straight
inward. Be sure to insert the straight end facing up.
2. Hook the straight end to the frame as shown in Figure 3-29.
3. Insert tweezers through the cutout in the back of the ASF frame to release the
tabs after mounting the hopper assembly. (See Figure 3-29.)
❏
When installing the LD roller shaft into the ASF frame after mounting both paper loading
assemblies, shift the right paper loading assembly to the right edge of the ASF frame,
then fix it by aligning the grroove in the back of the paper loading assembly, however,
moves freely from left to right or vice versa. (See Figure 3-30)
Compression Spring (1.66)
Hooks
Straight End of the Compresion Spring (1.66)
Roung cutout at the back of the
ASF Frame
Figure 3-29. Releasing the Compression Spring
ASF Frame
Paper Loading Assembly
ASF Frame Rail Ribs
Figure 3-30 Paper Loading Roller Installation
Содержание Stylus Color 800
Страница 1: ...EPSON COLOR INK JET PRINTER EPSON Stylus COLOR 800 SERVICE MANUAL SEIKO EPSON CORPORATION 4007371 ...
Страница 48: ......
Страница 56: ......
Страница 60: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 164: ......
Страница 173: ...EPSON Stylus 2 25 800 Rev A 6 6 Lubricate PF Roller Bushing 12 Figure 6 10 Lubrication Point 10 ...
Страница 184: ...Appendix Rev A A 9 A 3 Circuit Board Component Layout A 3 1 C202 MAIN Board Assembly Component Layout ...
Страница 185: ...EPSON Stylus 2 25 800 Rev A A 10 A 3 2 C202 PSB Board Assembly Layout A 3 3 C202 PSE Board Assembly Layout ...
Страница 187: ...EPSON SEIKO EPSON CORPORATION ...