
Maintenance 2. General Maintenance
76
C12 Rev.3
The Manipulator operation hours can be checked in [Controller Status Viewer] dialog box-
[Motor On Hours].
(1)
Select EPSON RC+ menu-[Tools]-[Controller] to open the [Controller Tools] dialog
box.
(2)
Click the <View Controller Status> button to open the [Browse For Folder] dialog
box.
(3)
Select the folder where the information is stored.
(4)
Click <OK> to view the [Controller Status Viewer] dialog box.
(5)
Select [Robot] from the tree menu on the left side.
For the parts subject to overhaul, refer to
Maintenance 17. Maintenance Parts List.
For details of replacement of each part, refer to the
Maintenance
section.
Please contact the supplier of your region for further information.
Содержание C12 Series
Страница 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Страница 2: ...Manipulator manual C12 series Rev 3 ...
Страница 8: ...vi C12 Rev 3 ...
Страница 14: ...Table of Contents xii C12 Rev 3 ...
Страница 16: ......
Страница 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Страница 83: ...Maintenance This volume contains maintenance procedures with safety precautions for C12 series Manipulators ...
Страница 84: ......
Страница 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Страница 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Страница 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Страница 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...
Страница 159: ...Maintenance 4 Cable Unit C12 Rev 3 145 ...