Maintenance 5. Joint #1
C12 Rev.3
175
Installation: Joint #1 Motor (M/C Cable Downward)
1.
Mount the Joint #1 motor unit to the base.
For details, refer to
Maintenance: 5.1.1 Joint #1-Replacing the Motor (M/C Cable Backward)
,
Removal steps (1) to (4).
2.
Install the brake power supply to the plate. Make sure to install
the brake power supply so that the cables will be in the direction
as shown in the photo.
Cross recessed head screws with washer: 2-M3×6
Tightening torque: 0.45
±
0.1 N·m
3.
Connect the following connectors.
Connector: X11, X010, BT1, BR011
4.
Install the following covers.
Connector plate (M/C cable downward).
Base cover (M/C cable downward)
Base maintenance cover
For details, refer to
Maintenance: 3 Covers
.
5.
Calibrate the Joint #1.
For details, refer to
Maintenance: 16. Calibration
.
Содержание C12 Series
Страница 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Страница 2: ...Manipulator manual C12 series Rev 3 ...
Страница 8: ...vi C12 Rev 3 ...
Страница 14: ...Table of Contents xii C12 Rev 3 ...
Страница 16: ......
Страница 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Страница 83: ...Maintenance This volume contains maintenance procedures with safety precautions for C12 series Manipulators ...
Страница 84: ......
Страница 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Страница 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Страница 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Страница 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...
Страница 159: ...Maintenance 4 Cable Unit C12 Rev 3 145 ...