Maintenance 5. Joint #1
162
C12 Rev.3
11.
Install the Joint #1 motor unit.
For details, refer to
Maintenance 5.1.1 Joint #1 – Replacing the Motor (M/C Cable Backward)
,
Removal steps (1) to (4).
12.
Pass the following parts through the hole inside the base to the
upper part of the base.
D-sub cable
Ground wire
RJ45 connector
F-sensor connector
13.
Connect the ground wires.
Cross recessed head screws with washer: 9-M4×8, 2-M3×6
Tightening torque : 0.9
±
0.1N·m (M4×8)
0.45
±
0.1 N·m (M3×6)
The ground terminals of the D-sub cables have fixed installation positions. Install them to the two
screw holes. (Photo: indicated by the arrows).
14.
Install the following parts.
Connector plate
Connector
Cable grounding plate
Brake power supply
For details, refer to
Maintenance 5.1.3 Joint #1 – Replacing the Timing Belt (M/C Cable Backward)
,
Installation steps (6) to (14).
NOTE
Содержание C12 Series
Страница 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Страница 2: ...Manipulator manual C12 series Rev 3 ...
Страница 8: ...vi C12 Rev 3 ...
Страница 14: ...Table of Contents xii C12 Rev 3 ...
Страница 16: ......
Страница 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Страница 83: ...Maintenance This volume contains maintenance procedures with safety precautions for C12 series Manipulators ...
Страница 84: ......
Страница 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Страница 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Страница 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Страница 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...
Страница 159: ...Maintenance 4 Cable Unit C12 Rev 3 145 ...