Maintenance 9. Joint #5
254
C12 Rev.3
Installation: Joint #5, #6 Reduction gear unit set
1.
Install the Arm #4 extension flange.
Hexagon socket head cap bolts: 12-M3×18
Tightening torque: 2.4
±
0.1 N·m
2.
Install the Joint #5 and #6 reduction gear unit.
Install the Arm #4 extension flange to the Arm #4 extension part.
Hexagon socket head cap bolts: 4-M6×20
Tightening torque: 13.0
±
0.6 N·m
3.
Pass the cables to the Arm #4.
Connect all the connectors inside the Arm #3 and bind them
together.
Fix the cables inside the Arm #4, and connect the D-sub to the Arm
#4.
For details, refer to Installation steps in
Maintenance 4.1 Cable
Unit
.
Содержание C12 Series
Страница 1: ...Rev 3 EM204R4255F 6 Axis Robots C12 series MANIPULATOR MANUAL ...
Страница 2: ...Manipulator manual C12 series Rev 3 ...
Страница 8: ...vi C12 Rev 3 ...
Страница 14: ...Table of Contents xii C12 Rev 3 ...
Страница 16: ......
Страница 30: ...Setup Operation 2 Specifications 16 C12 Rev 3 2 4 Outer Dimensions Unit mm ...
Страница 83: ...Maintenance This volume contains maintenance procedures with safety precautions for C12 series Manipulators ...
Страница 84: ......
Страница 155: ...Maintenance 4 Cable Unit C12 Rev 3 141 4 2 Connector Pin Assignment 4 2 1 Signal Cable ...
Страница 156: ...Maintenance 4 Cable Unit 142 C12 Rev 3 ...
Страница 157: ...Maintenance 4 Cable Unit C12 Rev 3 143 ...
Страница 158: ...Maintenance 4 Cable Unit 144 C12 Rev 3 4 2 2 Power Cable ...
Страница 159: ...Maintenance 4 Cable Unit C12 Rev 3 145 ...