EAV - EME/EMD Rev. A Models
Installation and Operations Manual
Electrical Connections
•
The heat pump must be connected by a qualified technician.
•
EAV does not include a circuit breaker on the incoming
power supply. The heat pump’s supply cable must be
connected to a circuit breaker. A disconnect must be
installed near the unit per local code requirements.
•
The routing of cables for heavy current and signals should
be made out through the cable openings on the heat
pump’s right-hand side, seen from the front.
•
The communication cable must be a shielded cable and be
connected between EAV terminal block X22 and the indoor
module/control module
•
Connect the flushing pump to the indoor module/control
module.
Note:
Electrical installation and service must be carried out by a
qualified technician. Disconnect power at the disconnect before
carrying out any servicing. Electrical installation and wiring must
be carried out in accordance with local code.
Note:
Check the connections, main voltage and low voltage
before the machine is started, to prevent damage to the air/
water heat pump electronics.
Figure 15: Outdoor Unit with Snow Stand
(available in 12” and 18” models)
Section 8: Field Wiring