Enertech Global
30
EAV - EME/EMD Rev. A Models
Installation and Operations Manual
Pipe Connections
•
Pipe installation must be carried out in accordance with
current local and federal regulations.
•
The unit is not equipped with external shut off valves on the
load side; these must be installed to facilitate any future
servicing.
•
The unit should be vented through the venting valve. This
is located on the load outlet leaving the unit and would be
used to bleed off excess air within the water lines. See the
illustration.
•
Be sure to use both of the supplied corrugated stainless
steel flex tubing, attaching them directly to the inlet and
outlet on the outdoor unit. These flexible tubes act as
vibration dampers. Be sure to fit them so that an elbow is
created on both lines.
•
When assembling the flex tubes to the unit be certain to
use a two wrench system of tightening. One wrench used to
back up the stationary copper fitting ,the other to turn the
corresponding end of the flex tube. Tighten by moving the
wrench on the flex tube.
•
All of the outdoor tubing
must be
fully insulated. 1-5/8”
insulation is included with the corrugated stainless steel
tubing kit .
LEK
Data
Serie.nr.
A rt.nr. 7
11453
OUT
IN
Backup Wrench
Required
Figure 8: Outdoor Unit Air Vent
Figure 9b: Stainless Steel Flex Tube Installation with Required
Backup Wrench
Figure 9a: Flex Tubing and Tubing Insulation
1-5/8” Insulation
included with Flex
Tubing kit. 12 feet total.
24 Inches
1-1/4”
FIP Thread
1-1/4”
FIP Thread
Section 6: Unit Piping Installation