Enertech Global
47
EAV - EME/EMD Rev. A Models
Installation and Operations Manual
WV Installation: Heat & Cool-with Hot Water
OPTIONAL
NON-PRESSURIZED
FLOW CENTER
TO
LOOP
FIELD
FROM
LOOP
FIELD
SOURCE IN
SOURCE OUT
P/T
P/T
P/T
P/T
SOURCE IN
SOURCE OUT
TO
LOOP
FIELD
FROM
LOOP
FIELD
FLUSH
VALVE
Typ
e XX
XX X
X-X
X X
XX
XXX
V ~
XX/XX
Hz
GFXX
X
EuP Ready
I
1/1
(A)
P
1
(W)
X.XX
X.XX
XX
XX
Max.
Min
.
P/N:
XXX
XXXX
PC:X
XXX
XX
IP
XX
TF
XX
Max.
X.X
MPa
A
High E
ffici
enc
y
XX
EEI<0.23
HYDRAULIC
SEPARATOR
RADIANT
FLOOR
HEATING
ZONE 2
RADIANT
FLOOR
HEATING
ZONE 3
HYDRONIC
AIR HANDLER
ZONE 1
DHW OUT
ΔP
LOAD OUT
DOMESTIC
COLD
WATER
HOT
COLD
LOAD
IN
LOAD
OUT
SYSTEM
PUMP
USE AGFP DOUBLE O-RING X CAM
ADAPTERS IF USING FLUSH CART;
USE AGAMFH DOUBLE O-RING X
GARDEN HOSE FEMALE ADAPTERS
IF USING GARDEN HOSES.
LOAD IN
DHW IN
FLUSHING
HOSES
CLOSED
“OFF” TO THE
BOTTOM
CLOSED
“OFF” TO
THE RIGHT
TO/FROM
BOILER IF
APPLICABLE
OPEN
CLOSED
OPEN
SET AT MIN. PRESSURE
CLOSED
CLOSED
CLOSED
Figure 13f: Flushing Piping on the Other Side of Hydraulic Separator, Step 2
Section 6: Unit Piping Installation
Piping Diagram - Flushing Piping on the Other Side of Hydraulic Separator, Step 2