Liquiline Control CDC90
Installation
Hauser
27
Pilot valve
Function
Hose number
9, 10
Compressed air control for
changeover valve, 2nd
measuring point
8, 11
11
Assembly retraction, 2nd
measuring point
9
12
Compressed air control for
assembly, 2nd measuring
point
10
M3 connection to changeover valve and assembly of 2nd measuring point
3. Connect the hoses of the M3 multihose from the pneumatic control unit to the
changeover valve and assembly as follows:
8 910
M3
1
2
11
A0033440
Hose number
Function
8, 11
Changeover valve
9
Compressed air control of the assembly
10
Assembly retraction
5.8.4
Rinsing line on rinsing block
1
2
3
7
6
5
4
A0032651
15
Rinsing block
1
Cleaner (pump 1)
5
Air rinsing block (pilot valve 4)
2
Buffer 2 (pump 3)
6
Water connection
3
Outlet rinse connection to assembly
7
Air process valve (pilot valve 3)
4
Buffer 1 (pump 2)
Содержание Liquiline Control CDC90
Страница 2: ......
Страница 117: ...Liquiline Control CDC90 Index Endress Hauser 117 Warnings 5 Water pipe 27 Web browser 59 Web server 54 111 Weight 113 ...
Страница 118: ...www addresses endress com ...