PlasmaQuant PQ 9000 (Elite)
Installation and commissioning
27
Figure 8 Dimensions of the PlasmaQuant PQ 9000 - top view
4.2
Supply and control connections
The supply lines are connected during the installation of the PlasmaQuant PQ 9000 by
service engineers from Analytik Jena AG.
The green power switch and the red plasma deactivation switch are located on the left-
hand side of the PlasmaQuant PQ 9000. Also on the left side, under a cover plate, there
are the connections for PC and accessories as well as the media connections for gas and
the cooling water inlet and outlet.
A pair of carrying handles are fastened to the left and right for transport and installa-
tion. The handles are unscrewed and removed after installation. The carrying handles
must be stored in a safe place in case the device has to be transported again or moved
within the laboratory.