
multi N/C pharma UV
Transport and storage
99
Fig. 41 Mains connection and gas connections at the multi N/C pharma UV
1 Holder for mains fuse "FUSE"
2 Main switch to switch the analyzer on and off
"power switch"
3 Mains connection "main plug"
4 Gas connection "analyte"
5 Gas connection "pump"
6 Connection "internal"
The connections "analyte" and "internal" are linked
via a hose bridge
7 Connection for inert gas "N
2
nitrogen"
8 Connection of the neutral conductor at the
sampler
9 Waste connection "waste"
10 RS 232 interface for HT module "HT"
11 RS 232 interface for the sampler "sampler"
12 USB port for PC
Make the mains connection as follows:
1.
Connect the low-heat connection cable to the mains connection at the rear of the
analyzer (3 in Fig. 41 p. 99).
2.
Connect the mains plug of the low-heat connection cable to a grounded socket.
ATTENTION
The operator is responsible for providing the necessary gas connection. Make sure that
the preliminary pressure at the pressure reducer is set to between 4 and 6 bar.
Make the carrier gas connection as follows:
3.
Connect the connection hose supplied to the pressure reducer of the gas supply
and the gas connection " N
2
nitrogen " on the equipment backplate (7 in Fig. 41 p.
99).
4.
Set the preliminary pressure at the pressure reducer to between 4 and 6 bar.
Connecting the gas
supply
Содержание Analytik Jena multi N/C
Страница 1: ...Operating Manual multi N C pharma UV TOC Analyzer...
Страница 6: ...Contents multi N C pharma UV 6...