
Maintenance and care
multi N/C pharma UV
68
7
Maintenance and care
7.1
Maintenance intervals
Analyzer
Maintenance task
Maintenance interval
Clean and maintain the device
weekly
Clean drip trays and reagent bottles
weekly and after filling
Inspect all hose connections for tight fit
weekly
Inspect the fastening screws for tight fit
monthly
Water traps
Maintenance task
Maintenance interval
Check gas flow
daily
Exchange water trap
as required, but no later than after 6
months
Halogen trap
Maintenance task
Maintenance interval
Check copper/brass wool for discoloration
daily
Replace depleted copper/brass wool
if half the copper wool is discolored black
or the brass wool is discolored
TIC condensate container
Maintenance task
Maintenance interval
Check for cracks and damages
3 months
Cleaning the TC condensation vessel
as required, but no later than after
12 months
Condensate pump
Maintenance task
Maintenance interval
Check for leaks
3 months
Replace porous pump hose
as required, but no later than after
12 months
Syringe pump
Maintenance task
Maintenance interval
Check for leaks
3 months
Clean the dosing syringe
as required, but no later than after
12 months
Reactor, UV lamp
Maintenance task
Maintenance interval
Check the lamp intensity
12 months
Clean the UV reactor
as required
Содержание Analytik Jena multi N/C
Страница 1: ...Operating Manual multi N C pharma UV TOC Analyzer...
Страница 6: ...Contents multi N C pharma UV 6...