Operation
Liebert
®
NXL
™
38
2.15.5 Maintenance Bypass Load Transfers—Single Module System
Follow these instructions to manually transfer the load between the Maintenance Bypass and the
UPS bypass line. Do not transfer the load between the Maintenance Bypass and the UPS module
(inverter) output. Use the Monitor/Mimic Display screen to verify that the UPS bypass line is
available.
Figure 39 UPS with two-breaker bypass cabinet
NOTICE
Risk of equipment damage. Failing to follow the proper sequence when operating any circuit
breaker may cause damage to the connected equipment. Operating a Maintenance Bypass
circuit breaker out of sequence could cut off power to the critical load.
NOTICE
Risk of equipment damage. The UPS system must be on internal bypass before performing
the following procedures and operating the MIB or the MBB, or damage to the UPS may occur
and the critical load may be lost.
DC Source
DC Bus
BFB
CB2
CB1
MBD
MBB
MI
B
MBFB
BIB
RIB
UPS Module
Two Breaker Maintenance Bypass Cabinet
Main Input
Switchgear
Critical
Load
Содержание Liebert NXL 250 kVA
Страница 8: ...vi ...
Страница 51: ...Operation 43 Liebert NXL Figure 42 1 N UPS Transfer to Inverter menu commands ...
Страница 57: ...Operation 49 Liebert NXL Figure 45 1 N UPS shutdown menu commands ...
Страница 86: ...Specifications Liebert NXL 78 ...
Страница 110: ...UPS Alarm and Status Messages Liebert NXL 102 NOTES ...
Страница 111: ......