Operation
37
Liebert
®
NXL
™
16. Perform
on the rest of the UPS units in the system ready to be placed on
line. This message will appear: “This Module Startup is complete. Finish the All Module Startup
in process or proceed to the Transfer menu to transfer.”
17. Press “Exit.”
18. Go to the first UPS and press “OK.” This message will appear: “Press OK to transfer all modules
to inverters.”
19. Press “OK.” This will put the system online and the load on the UPS.
2.15.4 Load Transfer and Retransfer—Single Module System
Changing the load from the UPS system to the UPS bypass is called a transfer. Changing the load
from UPS bypass to the UPS system is called a retransfer. Note that the UPS system control logic can
initiate automatic load transfers and retransfers. Refer to
.
Transfer Procedure
1. Press the “Transfer” menu button on the touchscreen. The Transfer/Retransfer screen will appear
in the multipurpose window (see
).
2. If the UPS output is in synchronization with the bypass, press the “Bypass” button. This will
transfer the load from the UPS to the bypass.
Retransfer Procedure
1. Press the “Transfer” menu button on the touchscreen. The Transfer/Retransfer screen will appear
in the multipurpose window (see
2. If the UPS output is in synchronization with the bypass, press the “UPS” button. This will
transfer the load from Bypass to UPS.
NOTE
Do not transfer the module from the transfer screen from any of these modules.
Содержание Liebert NXL 250 kVA
Страница 8: ...vi ...
Страница 51: ...Operation 43 Liebert NXL Figure 42 1 N UPS Transfer to Inverter menu commands ...
Страница 57: ...Operation 49 Liebert NXL Figure 45 1 N UPS shutdown menu commands ...
Страница 86: ...Specifications Liebert NXL 78 ...
Страница 110: ...UPS Alarm and Status Messages Liebert NXL 102 NOTES ...
Страница 111: ......