-13-
Chapter Two: System Installation
The following chapter explains how to install the system and provides guidelines and tips
on how to optimize the installation. It is recommended that you familiarize yourself with
the various circuit boards that make up the system –
see 1.4: Hardware Layout
.
2.1: Pre-Installation Planning
Before starting the installation procedure, it is worthwhile to draw a rough sketch of
the building and determine the required position for the control system and each
wireless device.
When deciding on the placement for installation, consider the following:
•
Mount the control system in a location with easy access to telephone
and power connections.
•
If installing with the GSM Cellular Communications module, the
control system should be mounted in a position where the GSM
signal is strong.
•
Refer to the following section in order to choose the optimal location
for wireless devices in relation to the control system.
2.1.1: Wireless Installation Guidelines
In order to optimize wireless communication, consider the following guidelines:
•
Whenever possible, mount the control system centrally in relation to
wireless sensors.
•
Avoid installation in close proximity to sources of high noise or radio
frequency interference. For example, metal air conditioner/heater ducts
and circuit breaker boxes.
•
Minimize the distance between the control system and transmitters.
•
Minimize the number of obstacles between the control system
and transmitters.
Figure 2.1: Minimizing Obstacles
•
Metal based construction materials, such as steel reinforced concrete
walls, reduce the range of radio transmissions.
Содержание infinite prime
Страница 1: ......
Страница 86: ... 86 Appendix A Menu Structure Legend Installer code required Master code required ...
Страница 87: ... 87 ...
Страница 88: ... 88 ...
Страница 89: ... 89 ...
Страница 90: ... 90 ...
Страница 91: ... 91 ...
Страница 92: ... 92 ...
Страница 112: ......
Страница 113: ...Copyright 2008 Electronics Line 3000 Ltd All rights reserved ...