KGL Operating Manual – VS 3010 BS
2018-07-02
/
130 178
9 VS 3010 BS menu structure
The pack controller must be parametrised using a connected operator terminal. The parametrisation is
performed via the CAN bus interface using which the communication with the pack controller takes place. It
makes no difference for the operation of the pack controller whether this is done with a system centre, a store
computer or an operator terminal; see chapter
.
System design VS 3010 BS, page 15
9.1 Menu tree
Main menu
Submenu
Submenu 2
Menu number
Screen name
Main menu
-
VS3010BS
1 Overview
1
2 Actual values
Display of actual values
2
ACT VALUES
Analogue values
2-1
ANALOG VAL.
Cyl.temp.Z1 √
2-1-a
Z1-VERD.
Cyl.temp.Z2 √
2-1-b
Z2-VERD.
Compressor Z1
2-2
Z1-VERD.
Compressor Z2
2-3
Z2-VERD.
Fans
2-4
FANS
System
2-5
SYSTEM
D2D *
2-6
D2D *
Cascade controller
2-7
CASCADE
3 Setpoints
3
SETPOINTS
System config
3-1
CONFIG
Sensor match →
3-1-a
TRANSDUCER
Refrigerant Z1 →
3-1-b
REFRIGT
Refrigerant Z2 →
3-1-c
REFRIGT
Control type Z2 →
3-1-d
REG.ART
Freig. Z1-Verd. →
3-1-e
Z1-VERD.
Text Öl/HD-St.Z1 →
3-1-f
T. ÖL/HD-S
Freig. Z2-Verd. →
3-1-g
Z2-VERD.
Text Öl/HD-St.Z2 →
3-1-h
T. ÖL/HD-S
Enable cond.stages →
3-1-i
ENABL.COND
Regulation
3-2
SETPOINTS
LP control
3-2-1
LP control
HP control
3-2-2
HP CONT
Verd.überwachung
3-3
COMP MON
Liq.level monitor
3-4
REFR. MON
External alarm
3-5
EXT. ALARM
Base load
3-6
BASE LOAD
Messages
3-7
Messages
D2D *
3-8
D2D
Defrost →
3-8-a
Defrost
Def. Z2R →
3-8-b
DefTyp Z2R
Defrost timer →
3-8-c
Defrost timer
Def.timer Z2R→
3-8-d
DEF.Z2R
4 Clock
4
CLOCK