![EBARA GP Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/ebara/gp/gp_operating-and-maintenance-manual_3846466035.webp)
11
ENGLISH
13. ATTACHED DIAGRAMS
A
– SHOT-PEENED SETS
SET 1 PUMP WITH VASCO CONTROL
SET TYPE WITH
EP/EP-E/SP-EFC/SP-MFC CONTROL
SET TYPE WITH
VASCO CONTROL
SET TYPE WITH
E-SPD+ CONTROL
1- electric pumps;
2- pressure gauge;
3- pressure switches (EP/SP-EFC/SP-MFC);
4- pressure transducer (EP-E/SP-EFC/SP-MFC/VASCO/E-SPD+);
5- intake manifold (or intake connection for sets with 1 pump);
6- delivery manifold (or delivery connection for sets with 1 pump);
7- intake and delivery isolating valves;
8- stop valve;
9- intake nipples with G 1/2 UNI ISO 228/1 connection for connection to the air supply (EP/EP-E);
10- electric control panel (EP/EP-E/SP-EFC/SP-MFC);
11- control device (VASCO/E-SPD+);
12- protection panel (VASCO/E-SPD+);
13- base (with feet if made of folded metal sheet);
14- vertical diaphragm type vessels on the delivery line (upon request and separately).
Содержание GP
Страница 2: ......
Страница 21: ...20 COLLEGAMENTO A QUADRO DI PROTEZIONE INVERTER A BORDO MOTORE VASCO E SPD H PRESSOSTATO DI AVVIAMENTO POMPA...
Страница 43: ...19 ENGLISH PROTECTION PANEL CONNECTION WITH ON BOARD PUMP INVERTER VASCO E SPD H PUMP STARTING PRESSURE SWITCH...
Страница 48: ...24 ENGLISH 18 UKCA DECLARATION OF CONFORMITY...