Installing Options and Accessories
5-6
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual
164201725—Rev 10
www.eaton.com/powerquality
Figure 5-5. Distributed Bypass Pull-Chain Wiring without MOBs
1
2
3
4
5
7
8
6
9
10
UPS 1
Twisted Pair
Twisted Pair
Twisted Pair
Twisted Pair
Twisted Pair
Twisted Pair
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
UPS 2
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
UPS 3
(If Installed)
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
1
2
3
4
5
7
8
6
9
10
Twisted Pair
UPS 4
(If Installed)
TB1
TB1
1
B
T
1
B
T
2
B
T
2
B
T
2
B
T
2
B
T
NOTE
Use twisted-pair wiring between the UPS and MOB AUX contacts.
Table 5-3. Pull-Chain Wiring Terminations
From
UPS 1
To
UPS 2
To
UPS 3
(If Installed)
To
UPS 4
(If Installed)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–1
(Pull Chain)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
TB2–2
(Pull Chain Common)
Содержание Power Xpert 9395 UPS
Страница 2: ......
Страница 27: ...Installation ...
Страница 28: ......
Страница 123: ...Section 2 Operation ...
Страница 124: ......
Страница 249: ......
Страница 250: ... 164201725 10 164201725 10 ...