![Eaton Power Xpert 9395 UPS Скачать руководство пользователя страница 196](http://html1.mh-extra.com/html/eaton/power-xpert-9395-ups/power-xpert-9395-ups_installation-and-operation-manual_3950068196.webp)
UPS Operating Instructions
7-34
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual
164201725—Rev 10
www.eaton.com/powerquality
6.
Close the doors and secure the latches.
7.
Observe the UPS control panel displays becoming active, indicating logic power.
8.
On any UPS, press the
CONTROLS
pushbutton on the main menu bar. The System Status screen is
displayed.
9.
On the System Status screen, verify the UPS status is
SHUTDOWN
and the UPM status is
OFFLINE
.
10. Verify no alarms are active.
11. If UPM 4 (FI-UPM) is installed, proceed to Step 12; otherwise, proceed to Step 16.
12. On the System Status screen, select the
UPM
command. The UPS Control Command screen is displayed.
13. On the UPS Control Command screen, select the
UPM 1
command.
14. Press the
CONTROLS
pushbutton on the UPS Control Command menu bar. The UPM 1 Control
Command screen is displayed.
15. Proceed to Step 18.
16. On the System Status screen, select the
UPM
command.
17. Press the
CONTROLS
pushbutton on the System Status Command menu bar. The UPM 1 Control
Command screen is displayed.
18. On the UPM 1 Control Command screen, select
UPM ON
.
19. Press the
SELECT
pushbutton on the UPM 1 Command menu bar.
20. Verify the following messages display sequentially on the UPM status line:
DC STARTING, CHARGER OFF
INVERTER STARTING
INVERTER SYNCING
READY
The UPM 1 rectifier and inverter turn on.
If UPM 4 (FI-UPM) is installed and the Inherent Redundancy option is enabled, a loss of redundancy alarm
will be issued. Silence the alarm and continue to Step 21.
21. If UPM 4 (FI-UPM) is installed, repeat Steps 13 through 19 selecting
UPM 4
to start UPM 4.
22. Verify the following messages display sequentially on the UPM status line:
DC STARTING, CHARGER OFF
INVERTER STARTING
INVERTER SYNCING
READY
The UPM 4 rectifier and inverter turn on. When the inverter reaches full voltage, the UPS is ready to
transfer to the Online mode and supply the critical load.
23. Repeat Steps 1 through 22 for each UPS in the distributed bypass system.
7.4.16 Starting a Single UPM
To start a single UPM:
1.
Unfasten the front door latch and swing the door open (see Figure 4-2).
2.
If the UPS contains input breaker CB1, verify that input breaker CB1 is open.
3.
Close the UPS input feeder circuit breaker.
4.
Close the UPS Bypass input feeder circuit breaker.
NOTE
To transfer to Online mode after starting individual UPMs, follow the procedure in
Содержание Power Xpert 9395 UPS
Страница 2: ......
Страница 27: ...Installation ...
Страница 28: ......
Страница 123: ...Section 2 Operation ...
Страница 124: ......
Страница 249: ......
Страница 250: ... 164201725 10 164201725 10 ...