![Eaton Power Xpert 9395 UPS Скачать руководство пользователя страница 113](http://html1.mh-extra.com/html/eaton/power-xpert-9395-ups/power-xpert-9395-ups_installation-and-operation-manual_3950068113.webp)
Installing Options and Accessories
Power Xpert
TM
9395 UPS (450–825 kVA) Installation and Operation Manual 164201725—Rev 10
www.eaton.com/powerquality
5-9
7.
Install wiring between the UPS and RMP II. See Figure 5-2 and Table 5-1 for the Powerware Hot Sync
CAN Bridge Card terminal location and wiring information, and Figure 5-7, Figure 5-8, and Table 5-5 for the
RMP II terminal location and wiring information.
8.
Install 120 Vac power wiring from the critical bus to the RMP II. See Figure 5-7, Figure 5-8, and Table 5-5
for the terminal location and wiring information.
9.
Close the front door and secure the latch.
10. Restart the UPS. See Chapter 7, “UPS Operating Instructions” for startup instructions.
Figure 5-7. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations
NOTE
120 Vac for the RMP II should be supplied from the critical bus by facility planners or
the customer.
Terminal TB1
Signal Connections
from the UPS
Ground
Terminal
Terminal TB3
120 Vac Power
Содержание Power Xpert 9395 UPS
Страница 2: ......
Страница 27: ...Installation ...
Страница 28: ......
Страница 123: ...Section 2 Operation ...
Страница 124: ......
Страница 249: ......
Страница 250: ... 164201725 10 164201725 10 ...