Figure 5 .10

Environment page

T/H sensor parameter

Displays temperature and humidity of Hot aisle or cold aisle

Smoke sensor status

Displays smoke status

Water leakage sensor status

Displays water intrusion status

Device detail

Displays real-time parameters and device warning information

Details concerning the device

Device control

Switch to control different colors, etc.

Real-time parameters

Displays operating status of LED strip light

Device warning

Displays current warning information of the device

ote: 

N

The “*” mark indicates this action is by staff authorized to access

5.8  Door page

Figure 5 .11

Содержание iCube 2.0

Страница 1: ...Micro Data Center Eaton iCube 2 0 User manual...

Страница 2: ...CULAR PURPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMEN...

Страница 3: ...16 3 2 5 Communication to Temp Humidity sensors 17 3 2 6 Communication to smoke sensors 18 3 2 7 Communication to lighting system 18 3 2 8 External Electrical connection 19 3 3 Installation of integra...

Страница 4: ...ge 46 6 Guarantee for repair and maintenance 47 6 1 Periodic maintenance of the power distribution system 47 6 2 Periodic maintenance of the cooling system 48 6 3 Periodic maintenance of monitoring sy...

Страница 5: ...he UPS and air conditioners please refer to the UPS and cooler user manuals and maintenance manuals Electrical safety 1 For electrical connections insulating tools should be used 2 After the product e...

Страница 6: ...nets can be deployed quickly and offers great flexibility in the choice of configurations They are designed for use in environment requiring micro data centers computer or server rooms for small and m...

Страница 7: ...0K42U EA 3 5KW 1 EMUPS9PX11K E04S EW06 PDM 10K Basic type IEC32A 20x C13 4 x C19 1PCS EMMRS10K1 2 EA 7KW 1 2 EMUPS9PX11K E08S EW10 PDM 10K Basic type IEC32A 20x C13 4 x C19 5PCS EMMRS 2 10K1 2 EA 7KW...

Страница 8: ...a UPS installation method Rack mounted Power distribution system Power distibtuion module Form factor 3 12U PDU 32A Basic type 0U PDU standard IEC socket Monitoring subsystem Control monitoring server...

Страница 9: ...and assemble the device cabinet Notes System structure parts and wire installation Notes Cooler connecting wire Notes For wire installation Notes For wire installation Bartender Wire cutter Hex wrench...

Страница 10: ...EA 1430 774 2236 282 5 EMSRE6K42U EA 270 EMSRS3K42UA EA 325 EMSRS6K42U EA 300 5 EMSRS10K42U EA 300 5 EMMRS10K1 2 EA 1630 774 2236 350 9 EMMRS 2 10K1 2 EA 367 1 EMMRS20K1 4 EA 359 5 EMMRS 2 20K1 4 EA 3...

Страница 11: ...ke sure the center of gravity of the device is balanced during transport 3 The outdoor unit must be horizontal and vertical Do not reverse the unit or set it upside down otherwise the cooler will be d...

Страница 12: ...e installed on cement floor or raised floors Ensure sufficient space or height between the cabinet legs and the floor Look into the bottom dimension of the iCube 2 0 cabinet as shown in the figure 2 5...

Страница 13: ...Preparation for installation EATON ICUBE 2 0 UM ICUBE2 0 SG 0822 August 2022 www eaton com Installation site planning diagram Top View Figure 2 8 Installation site planning diagram side view Figure 2...

Страница 14: ...able to row multiple cabinets are as follows Remove the side panel of the main equipment cabinet and side panel of IT cabinets Remove the side panel fixing screws and side panel fixing accessories Loo...

Страница 15: ...11 Installation EATON ICUBE 2 0 UM ICUBE2 0 SG 0822 August 2022 www eaton com Flow chart of the cabinet joining process Figure 3 1 Figure 3 2 1 2...

Страница 16: ...12 Installation EATON ICUBE 2 0 UM ICUBE2 0 SG 0822 August 2022 www eaton com Figure 3 3 Figure 3 4 3 4...

Страница 17: ...ll lines must follow the principle of horizontal and vertical wiring There should be cable ties inside the cabinet or inside the cable rack to ensure the aesthetics of the cable WARNING For the row mu...

Страница 18: ...ttention should be paid to the corresponding labels L L N N PE PE see the figure 3 6 below Figure 3 6 3 2 3 Communication to the cooling units 3 2 3 1 Data and control connections Connect the network...

Страница 19: ...n the top of air conditioner cabinet 1 to the PlAN port at the rear of cooling unit 2 in the following figure 3 9 3 10 Connect the network cable left on the top of air conditioner cabinet 2 to the PLA...

Страница 20: ...ainning on the top of cabinet 5 to the in port of the elec tronic lock on the rear door of cabinet 6 6 Connect the network cable Lock13 IN identifier remainning on the top of cabinet 6 to the in port...

Страница 21: ...cabinet 4 to T H5 IN port in front of the cabinet 5 Connect the cable T H6 identifier remaining on the top of cabinet 5 to T H6 IN port in front of the cabinet 6 Connect the cable T H7 identifier rema...

Страница 22: ...top of cabinet 5 to smoke sensor 1 2 3 4 on the top of cabinet 1 ote N The smoke sensor needs to be loosened and unscrewed before connection The wires are connected as follows Figure 3 16 3 2 7 Commu...

Страница 23: ...sory kit provided by Eaton or you can use your own Figure 3 19 Figure 3 20 Input cable specification Model Weight Number of cabinets Main iput Switch Input cable specifications EMMRS10K1 2 7KW 1 2 63A...

Страница 24: ...the factory as a sub component in the cabinet with power wires and communication cables connected The cooling unit comes along with one 2m long drainage hose with the inner diameter of 12mm users onl...

Страница 25: ...e than 200mm The copper pipe should be routed through the holes reserved at the bottom of the cabinet 3 After insulating copper pipes secure it to the square hole on the cabinet using cable ties Figur...

Страница 26: ...p Pipes from the left side of the cabinet Rear View 2 To facilitate bottom piping raised floor is required The height of the raised floor should be more than 200mm The copper pipe should be routed thr...

Страница 27: ...ost otherwise it will affect the installation of customer IT equipment 3 Regarding top piping see the following figure 3 27 to avoid impact on IT device installation The copper pipes should be routed...

Страница 28: ...ly complies with the requirements on the nameplate To avoid corrosion and overheating of the terminals all required power supply wires must be copper wires The power cable connected to the electrical...

Страница 29: ...equipped with power terminals as shown in the picture XT1 is the main power supply of the unit XT2 L N and PE are the outdoor power supply and XT2 A and B are the outdoor unit communication Figure 3...

Страница 30: ...tor 2 During the draining process the gravity drainage pipe should be blocked with a plug 3 Pump drainage pipe transparent pipe is only appliable to the split cooling unit The integrated cooling unit...

Страница 31: ...posi tive and negative connections of the battery are correct 3 Check that the wiring of the single module is secured and not loose 4 Confirm that the power supply voltage and frequency meet the cond...

Страница 32: ...10 Switch on cooling input circuit breakers on the power distribution module 11 Check the monitor display if cooling shows error or not When normal click the start button of the cooling unit A C subme...

Страница 33: ...interface The mark is indicated by staff authorized to access 5 2 Login Figure 5 1 1 On the login page of the monitoring screen enter the username and password to login the system 2 With the first lo...

Страница 34: ...current operating mode battery source and loading status of the UPS A C overview Displays the working status of the air conditioner and operating status of the fan PUE Displays current PUE value Devic...

Страница 35: ...lays remaining time battery voltage information Device detail Displays device control real time parameters device information device inspection device s warning information Details of the device Devic...

Страница 36: ...gram of the power distribution Power distribution information bar Displays voltage frequency current total apparent power total operating capacity and power distribution capacity information Device de...

Страница 37: ...e parameters device information device inspection device warning information Details concerning the device Device control Turn on turn off supplied air temperature returned air temperature installatio...

Страница 38: ...atus Water leakage sensor status Displays water intrusion status Device detail Displays real time parameters and device warning information Details concerning the device Device control Switch to contr...

Страница 39: ...pen Device detail Display real time parameters and device warning information Details of the device Real time parameters Display operating status of locked door Device warning Display current warning...

Страница 40: ...ast 30 days warning information of each device warning information by month and device information with number of max warnings Historical alarm records Displays and export historical alarm list Histor...

Страница 41: ...ment templates Page management Configure contents of the device page Data management Backup and restore data manage historical data storage time etc Interface management Northbound interface managemen...

Страница 42: ...ork configuration 1 The user can click on the Setting tab on the left column and then select Network as shown in the figure 5 17 5 18 below Figure 5 17 Figure 5 18 Click IP config to modify the system...

Страница 43: ...e user can click on the setting tab on the left and click Authority Management Figure 5 19 After entering the staff permission settings click ADD Account go to the new account interface enter the acco...

Страница 44: ...eaton com At staff permission settings click Modify Rights and select the corresponding account to set the permissions for that account Figure 5 22 Figure 5 23 5 12 3 The APP application permission Th...

Страница 45: ...te the license Note The registration code needs to be generated according to the corresponding serial number Please download the APP from Eaton s official website For more information kindly refer to...

Страница 46: ...lect the corresponding SNMP version V1 V2 V3 when selecting V1 V2 the interface will be as follows Figure 5 29 Click the symbol to modify password for read write and IP permissions of the correspondin...

Страница 47: ...larm by SMS send the alarm notification by SMS via mobile phone card Alarm via email send the alarm notification via email 2 Alarm by SMS will require a SIM card to be inserted into the SIM card slot...

Страница 48: ...Configuration of gateway parameters Click the Serial Port Parameter Setting set each parameter value in the display frame and click Setting to take effect as shown Figure 5 34 Filter SMS messages 1 C...

Страница 49: ...to take effect Figure 5 36 Mail Accout Your full email address Password Your Gmail password SMTP Service Take the Gmail for example smtp gmail com Port for SSL 465 Note Check that IMAP SMTP is turned...

Страница 50: ...en and when there is a fire alarm it will turn to NC Normal close At the same time of receiving the fire alarm the front and rear doors of the cabinet will open and external fire gas can enter the cab...

Страница 51: ...of the UPS panel and replace faulty fans promptly Battery maintenance If the UPS is equipped with battery the battery must be maintained regularly Maintenance Notes 1 Battery life is greatly affected...

Страница 52: ...the param eters operate with a normal display 3 Check if input and output parameters battery and other parameters of the UPS are displayed normally in the monitoring subpage of the UPS 4 Check if the...

Страница 53: ...an warning The cabinet door did not close properly Check and close the cabinet door The electronic lock s wire is weak Check if the wire system is good or not The door is turned on due to the high tem...

Страница 54: ...arning value in the cooler s outlet is set too high Reduce the temperature setting value in the cooler s outlet the default value is 10 C The cooler s air supply temperature is too low Environment tem...

Страница 55: ...ached to the metal sheet and is installed without screws It can be hot swappable as shown Figure 8 1 Replacement steps Unplug the network cable insert new temperature and humidity sensor connnect the...

Страница 56: ...per and lower location plug in the cable pay attention to the corresponding line 8 4 Smoke sensor The smoke sensor is installed inside of the top of the cabinet divides into upper and lower parts the...

Страница 57: ...new lights Connect the plug Turn on Figure 8 5 8 6 LED strip light LED strip light is installed on the right side inside the front door of the cabinet is attached to a white light fixture All the lig...

Страница 58: ...l documentation by Eaton is binding Photos and pictures also do not warrant a specific layout or functionality Their use in whatever form is subject to prior approval by Eaton The same applies to Trad...

Отзывы: