Top Piping area for 4.2kW split cooling
Fig . 3 .24
Connect Refrigerant lines-8.1kw split cooling
Suggestions:
1. Route Top Pipes from the left side of the cabinet. (Rear View.)
2. To facilitate bottom piping, raised floor is required. The height of the raised floor should be more than 200mm.
The copper pipe should be routed through the holes reserved at the bottom of the cabinet.
3. After insulating copper pipes, secure it to the square hole on the cabinet using cable ties.
Figure 3 .25
Top piping
Figure
3 .26
Bottom piping