Connect Refrigerant lines-4.2kw split cooling
Suggestions:
1. Before installing the top piping, remove the right side panel first (Rear View), connect the pipe, then reinstall
the side panel.
2. To facilitate bottom piping, raised floor is required .The height of the raised floor should be more than 200mm.
The copper pipe should be routed through the holes reserved at the bottom of the cabinet.
3. After insulating copper pipes, secure it to the square hole on the cabinet using cable ties.
Figure 3 .22
Top piping
Figure 3 .23
Bottom piping
Piping requirements
1. Copper pipes should not be flattened or bended
2. The refrigerant piping should not block the square hole on rack’s vertical post, otherwise, it will affect the
installation of customer IT equipment
3. For details about Top piping, see the following figure: 3.24 to avoid impact on device installation