5
Preparation for installation
EATON ICUBE 2.0
UM.ICUBE2.0.SG.0822 August 2022 www.eaton.com
2
Preparation for installation
2.1 Installation tools
Before installation, it is recommended to have the relevant tools available. The following table lists the tools
needed to install the Eaton iCube 2.0 system:
Tool appearance, specifications, and tool name
Adjustable wrench (6”) 4-sided screwdriver
1-sided screwdriver
Needle Nose Pliers
Diagonal Cutters
Notes: Adjust the device
cabinet screws and
assemble the device
cabinet
Notes: System structure
parts and wire installation
Notes: Cooler connecting
wire
Notes: For wire installation Notes: For wire installation
Bartender
Wire-cutter
Hex wrench
Tape (5m)
Levelling instrument
Notes: Wire installation
Notes: Wire installation
Notes: System structure
installation
Notes: Locate the device
cabinet
Notes: Levelling instrument
adjusts device in the
device cabinet and cabinet
assembly
Gloves
Antistatic gloves
Insulation tape
Multimeter
Electroprobe
Notes: Used for protection
when assembling structures
Notes: Used to protect
when installing the cooler
Notes: Use insulation tape
when installing wire
Notes: Test circuit
Notes: Circuit Check
Preparation for installation