Installing the Ergonomic Workstation
Drill Holes for Flat Panel Display Support
Before completing this procedure, refer to the project-specific bill of materials (BOM) and CAD
drawings for FPD mount configuration. Individual component installation / assembly
instructions for bow arrays and Centris
®
Cup can be found on the website under their
respective part numbers.
Based on the pole configuration and the number of FPDs being installed, refer to the table
below and follow these instructions to drill the holes for the FPD support.
If You Are Installing this Flat
Panel Display Configuration…
Then Drill 2-1/2”
Diameter Hole Here.
See this Configuration
in Figure Below
2 over 2 flat panel displays (see
figure below)
6.00 A
3 over 3 flat panel displays
4 over 4 flat panel displays
14.15
B
5 over 5 flat panel displays
18.90
C
2 over 2 Flat Panel Displays Shown
Complete the following procedure to drill support holes in the rear surface.
1.
Mark the correct existing pre-drilled pilot hole based on the flat panel display configuration
noted in the table above. See the figure below for cutout locations.
2.
From the bottom of the rear surface, drill two .250” pilot holes completely through the deck
using a 1/4 (.250”) inch drill.