The Edit sub-menu will contain the following items:
Figure 3.49 APPT – Edit sub-menu
•
Add
By selecting the Add item, new substation or new device will be created. If selected
node is project, it will add substation and if selection is on substation it will add device.
Root node for adding the additional device will be called substation node, by default,
although the user will be able to change the text of the node. The form that collects the
name and the description of the node could look like following one:
Figure 3.50 APPT – Add substation
Edit