Operation 39
Running Product
1. Turn on system power and push Conveyor Start.
2. Place the product on the infeed conveyor, lining it up against the rear of the
infeed conveyor.
3. Carefully watch the sequence of events as the product goes through the
complete cycle of operations including sealing.
NOTE: If you change conveyor speeds, the bag length timer may need to
be adjusted.
NOTE: If difficulty arises, see the operational troubleshooting section.
For beginning purposes, set the seal / cutter opening time so that the seal /cutter clears
the package height by one inch (1”).
For example, for a 5-inch tall box, the seal / cutter opens 6 inches.
Similarly, allow approximately the same distance, H, between packages, so that the
seals occur a distance D = ½ × H before and after each package.
5"
6"
1" Clearance
1" Clearance
Infeed Conveyor
Exit
Exit
Infeed
Height
Package
1"
Package
H=