Operation 25
Powering Up and Cycling the Sealer
Once the electrician has stated that all electrical work is complete and the air line is
connected to the regulator and providing 60 PSI and 3.5 CFM, make sure all shipping
ties are removed and all personnel are clear of the equipment, then power up the sealer
and run it through a cycle by performing the following.
1. If equipped with a main power switch, lift the main power switch to on position.
If equipped with Control Panel disconnect switch, place lever in connect position.
2. Check the red E-Stop buttons and reset them if needed.
As the machine powers up, the Operator Panel displays current system
information, such as the system Model Number, Serial Number, PCL information
and connection type, and allows access to the setup screens. Press the “Start
Screen” button to navigate to the Start Screen.
3. Touch the “Power On” button on
the operator’s panel.
4. Touch the “Head Cycle” button.
The head should complete one
cycle.
5. Touch the “Conveyor Start”
button. The conveyors will run and
this also enables the photo eye.
6. When all of the above options
function properly, touch the red
“Conveyor Stop” button.
Setting Temperatures and Timers
1. Touch the “Setup Screen” button
to navigate to the Setup Screen.
•
A Log On window will appear
asking for a user name and
password.
•
If ADMIN does not appear in
the user Log On window,
touch the User box. Enter
ADMIN using the touchscreen
keyboard as shown below,
and then touch Enter ( ).
Touch the Password window.
Содержание EA Professional Series
Страница 2: ......
Страница 4: ......
Страница 64: ...64 Appendix B Temperature Setting Specifications Appendix A Electrical Schematics...
Страница 70: ......