18 Installation
Moving Units Together and Making Connections
I. Set up the L-sealer/Exit Conveyor module first. Move it to its location, and when it
is in position, use chock blocks to block the casters and secure it from moving.
Adjust the leveling legs to support the unit and so the conveyor surface and seal
heads are level along both the machine-direction axis and transverse-direction
axis.
II. Next, bring the PFU/Infeed Conveyor/Inverter module up next to and in position
with the L-Sealer/Exit Conveyor module. Note that there are attaching flanges
welded to the base of the PFU/Infeed Conveyor/Inverter module, with bolt holes
that must align with bolt holes in the base of the L-Sealer/Exit Conveyor module.
When the unit is in position, use chock blocks to block the casters and secure it
from moving.
L-Sealer
PFU
Inverter
Infeed
Conveyor
L-Sealer
Level
Exit
Clearance
Adequate space for Infeed
Conveyor module
Lev
el
Clearance
Adequate clearance for
Power Film Unwind (PFU)
Use leveling feet
at each of four
corners to lift module
off casters and level
sealer and conveyor.
Содержание EA Professional Series
Страница 2: ......
Страница 4: ......
Страница 64: ...64 Appendix B Temperature Setting Specifications Appendix A Electrical Schematics...
Страница 70: ......