
Before re-using for a patient
●
Re-assemble equipment, see "Stripping down",
p. 37-38.
●
Check that the seals for support bracket in the trough
are movable.
Fitting seals in the hand port openings:
●
Open hand port.
●
Insert seal marked with an "L" on nose, into left
opening.
●
Insert seal marked with an "R" on nose, into right
opening.
●
Position nose of seal on hinge.
Put sealing lip (thin edge of profile) to the outside.
●
Close hand port.
●
Testing Readiness for Operation, see p. 14.
Allow water heater to run dry:
– to disinfect heater
– to test that "water shortage" display is working
properly.
●
Switch on humidity control.
●
Allow heater to run until "water shortage" alarm is
triggered, see p. 30.
●
Switch off humidity control.
Do not put full bottles into bottle holder until just
before placing baby in incubator.
If using water container:
Do not refill water container until just before placing
baby in incubator.
●
Operate incubator in standby, p. 19
or
●
switch off incubator, cover with dust cover and store
ready for use.
Care
Before re-using
40
L
R