Page 64 of 145
6.1.2 Installation
1. Remove all pressure from the product piping.
2. Remove the current mechanical leak detector.
CAUTION: Be sure to prevent any debris or scaling from entering
system through the leak detector opening.
3. Use the fuel-absorbent cloths to soak up fuel within the
work area and around the dry pipe threads.
4. Use an emery cloth to remove any burrs in the packer of
the VLLD sensor seat.
5. Plug the line test port.
NOTE: Apply fuel-approved thread sealant (not thread tape) to
plug.
6. Install the sensor in the existing submersible pump line
leak detector port. Take care not to damage O-ring seal.
a. Apply proper thread sealant to the sensor threads.
b. Install into test port and tighten by hand.
c. Using the proper wrench, tighten the sensor using the
flats below the cap or the hex on top of the sensor.
Tighten only enough to prevent leakage. Do not over
tighten!
7. Connect the sensor wires to the field wires in the junction
box using the supplied wire nuts. See figure 6.5.
8. Seal the electrical connections with the epoxy seal packs.
9. Clean the area and power the pump.
Figure 6-2 Soak-up Fuel
Figure 6-3 Apply Thread Sealant
Figure 6-4 Tighten Sensor
Figure 6-5 VLLD Wiring Connections
Содержание OPW SiteSentinel iSite
Страница 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Страница 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Страница 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Страница 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Страница 33: ...Page 33 of 145 www opwglobal com ...
Страница 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Страница 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Страница 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Страница 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Страница 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Страница 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Страница 143: ...Page 143 of 145 www opwglobal com ...
Страница 146: ...Page 146 of 145 www opwglobal com NOTES ...