Page 108 of 145
Appendix F- Icon Glossary (cont.)
Probe/Tank Alarms
Description
Normal
Alarm
Acknowledged
Alarm Ended But
Not Acknowledged
Alarm Condition
Ended
Unavailable
Part numbers and description that
would be associated to the conditions.
Icon only seen during
auto-detection
process to show
sensor type.
Icon outlined with a
dotted red line and
red triangle. Occurs
when an alarm
condition is seen.
Icon outlined in blue
with red triangle.
Occurs when user
clicks on alarm in
alarm screen.
Icon outlined in blue
and triangle is blue.
Occurs when alarm
has ended but has
not
been
acknowledged.
Icon completely gray.
Occurs after alarm
has been
acknowledged and
the alarm event has
ended.
Displayed when the
item is currently
unavailable. Icon is
completely grayed.
UST Tank Alarms
High-High Product Alarm:
Occurs when the product float is above
the threshold for the condition.
N/A
High-Product Alarm:
Occurs when the product float is above
the threshold for the alarm condition.
N/A
Low-Product Alarm:
Occurs when the product float is below
the threshold for the alarm condition.
N/A
Low-Low Product Alarm:
Occurs when the product float is below
the threshold for the alarm condition.
N/A
High-High Water Alarm:
Occurs when the water float is above
the threshold for the alarm condition.
N/A
NOTE:
When sensors are added manually to the system when using non-smart sensors or adding sensors to a VSmart Module, the icons will have a little man in the
upper-left-hand corner of the icons, as shown to the right.
Содержание OPW SiteSentinel iSite
Страница 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Страница 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Страница 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Страница 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Страница 33: ...Page 33 of 145 www opwglobal com ...
Страница 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Страница 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Страница 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Страница 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Страница 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Страница 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Страница 143: ...Page 143 of 145 www opwglobal com ...
Страница 146: ...Page 146 of 145 www opwglobal com NOTES ...