4.5.4 Installing Adaptor, Float, Weight on the Probe
12. Carry the probe to the top of the tank in its rolled-up state.
13. Carry the floats and remaining installation components to
the top of the tank.
14. Cut the single tie wrap (Labeled #1) that is securing the tip
of the probe to the rest of the coil. This should provide
enough length to install the float and related hardware.
15. Assemble the remaining adaptor hardware that the float will
fit through and slide this adaptor assembly onto probe. Do
not apply thread sealant at this time.
16. Install the product float on the probe shaft with the magnet
towards the bottom of the probe.
17. Install the weight on the probe shaft with the recess toward
the bottom of the probe.
18. Install the weight-retaining pin through the hole in the tip of
the probe.
Figure 4-5 Adaptor, Float and Weight Installation
4.5.5 Installing the Flex Probe
19. Position the coiled probe over your shoulder so that the coil
is vertical with the float in front of you.
20. Feed the weight and floats into the tank opening. Be careful
not to scratch the probe shaft during the installation.
21. Cut the next tie wrap (Labeled #2) and continue feeding the
probe into the tank.
22. Continue cutting the tie wraps in order until the probe is all
the way in the tank.
23. Hand-tighten the probe into the still loose adaptor fittings.
Thread sealant is not required on the nylon probe bushing.
24. Install the rest of the adaptor to the tank using a minimal
amount of thread sealant. The assembly was done in this
manner to prevent the soft nylon probe bushing from being
cross-threaded.
Figure 4-6 Flex Probe
Installation
Содержание OPW SiteSentinel iSite
Страница 15: ...Page 15 of 145 www opwglobal com Figure 2 4 Console Connectivity ...
Страница 17: ...Page 17 of 145 www opwglobal com Figure 2 6 Wiring Connections ...
Страница 22: ...Page 22 of 145 www opwglobal com Figure 2 11 Standard Twisted Pair Petro Net Installation ...
Страница 25: ...Page 25 of 145 www opwglobal com Figure 2 14 Petro Net Over Ethernet Option ...
Страница 33: ...Page 33 of 145 www opwglobal com ...
Страница 34: ...Page 34 of 145 www opwglobal com Figure 4 1 924B Probe Installation ...
Страница 61: ...Page 61 of 145 www opwglobal com Figure 5 22 In Tank Probe Setup ...
Страница 74: ...Page 74 of 145 www opwglobal com Figure 9 3 Dry Well Monitoring Single Wall Tank ...
Страница 78: ...Page 78 of 145 www opwglobal com Figure 9 7 Double Wall Tank with Well Monitoring ...
Страница 90: ...Page 90 of 145 www opwglobal com Figure 13 7 ACR RIM Jumper Board ...
Страница 142: ...Page 142 of 145 www opwglobal com Declaration of Conformity ...
Страница 143: ...Page 143 of 145 www opwglobal com ...
Страница 146: ...Page 146 of 145 www opwglobal com NOTES ...