2 - 15
Installation / Putting into Operation
Service Manual Cafitesse 100
07.2004
STOP
xxxxx
xxxxx
ON
OFF
STOP
xxx
xx
Fig. 8
4
3
5
Fig. 7
2
1
Fig. 9
6
•
Insert both lower buttons (1) (Fig. 7).
•
Leave the upper button (2) free for
programming (Fig. 7).
Set the key to ON with dispensers
equipped with a key switch.
•
Mount the cup carrier (3) (Fig. 8).
•
Connect the water supply and open the
water stop valve in the water pipe.
•
Insert the power supply plug.
•
Switch on the main switch. Water should
now flow into the boiler.
Observe if the floater switches off.
•
The fan must now be operating to cool the
cooling compartment. The yellow LED (4)
extinguishes as soon as the cooling
compartment has reached the correct
temperature. (Fig. 8)
•
Place a container below the hot water
delivery tap (5) at the front of the dispenser
and open the tap. (Fig. 8)
Observe if the boiler is being refilled with
water at the same time.
WARNING:
There is the danger of being
scalded by hot water. Keep
hands and other parts of the
body away from the delivery
area.
•
Observe the floater wire (6) during the
filling process. In the beginning the floater
wire (6) should fall down and then rise.
This indicates that water is running into the
boiler faster than it is taken from it. (Fig. 9)
•
Stop actuating the hot water delivery tap to
allow the boiler to be filled completely.
Observe again if the floater wire switches
off.
Содержание Cafitesse 100
Страница 4: ......
Страница 6: ......
Страница 14: ...1 8 Preface and Safety Instructions Service Manual Cafitesse 100 07 2004 ...
Страница 50: ...3 14 Faults Service Manual Cafitesse 100 07 2004 3 3 Faults occurred in the Market and their Solutions ...
Страница 73: ...4 23 Programming Service Manual Cafitesse 100 07 2004 4 3 Reading further Data Not included ...
Страница 74: ...4 24 Programming Service Manual Cafitesse 100 07 2004 ...
Страница 82: ...07 2004 5 8 Functions Service Manual Cafitesse 100 ...
Страница 114: ...07 2004 5A 32 Functions Water System Service Manual Cafitesse 100 Fig 1 A 6 1 Café cool ...
Страница 136: ...07 2004 5A 54 Functions Water System Service Manual Cafitesse 100 ...
Страница 137: ...07 2004 5B 1 Functions Brewing System Service Manual Cafitesse 100 B Brewing System Not available ...
Страница 138: ...07 2004 5B 2 Functions Brewing System Service Manual Cafitesse 100 ...
Страница 139: ...07 2004 5C 1 Functions Dosing System Service Manual Cafitesse 100 C Dosing System C 1 Adjustments Not required ...
Страница 152: ...07 2004 5C 14 Functions Dosing System Service Manual Cafitesse 100 C 7 Accessories Not available ...
Страница 162: ...07 2004 5D 10 Functions Product Delivery Service Manual Cafitesse 100 ...
Страница 176: ...07 2004 5F 14 Functions Cooling System Service Manual Cafitesse 100 ...
Страница 184: ...07 2004 5G 8 Functions Housing Service Manual Cafitesse 100 ...
Страница 193: ...07 2004 5K 9 Functions Power Supply and Control Service Manual Cafitesse 100 ...
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 210: ...07 2004 5K 18 Functions Power Supply and Control Service Manual Cafitesse 100 ...