28
ED50
01-2020
DL4615-001
dormakaba ED50 Installation Instructions – Fine cover
Chapter 12
12 ED50 operator installation
12.1 Installation preparation
WARNING
Review safety information in Chapter 3!
WARNING
ED50 system should be installed by trained
and knowledgeable installers experienced in
installation and commissioning of swing door
operators.
The installer should be familiar with all
applicable local and national building code
requirements, and with requirements of
current ANSI/BHMA standard A156.19, Power
Assist and Low Energy Power Operated
Doors.
NOTICE
Installation steps listed in Chapter 12 through 14
are a recommendation. Structural, local
conditions, available tools, or other factors or
circumstances may require modification to
these steps.
12.1.1 dormakaba USA, Inc. ED50 hardware.
1. Locate shipping boxes for ED50 operator and
hardware.
12.1.2 Door frame and door.
CAUTION
Insure area around door frame, adjacent walls
and door is readily accessible and free of
objects and debris.
12.1.3 Accessories
1. Verify accessories planned for or in place for the door.
Chapter 9, system accessories, list typical accessory
types for ED50 operators.
TIPS AND RECOMMENDATIONS
Accessory wiring to ED50 operator should be
planned for prior to operator installation.
12.1.4 ED50 mounting plate installation preparation.
CAUTION
Using applicable ED50 installation template,
holes for mounting plate fasteners must be
located and drilled into door frame, wall or
substructure prior to mounting plate
installation.
CAUTION
Mounting plate installation must be orientated
with 115 Vac connection towards door hinge side.
12.1.5 ED50 mounting plate extension used with
optional full door width cover.
TIPS AND RECOMMENDATIONS
Mounting plate extension is included
for full width cover installation.
• Reference Appendix D for
mounting base extension and full
width cover installation.
12.1.6 ED50 115 Vac electrical installation.
WARNING
Work on electrical equipment and 115 Vac
wiring installation must be performed only by
qualified personnel
!
WARNING
Electrical shock hazard! 115 Vac branch circuit
disconnect for ED50 must be Off prior to
start of electrical installation.
WARNING
115 Vac wiring to ED50 operator must conform
to local and national electrical codes.