User manual 250/400 OLED
Rev.: SG-20220516
Page 19 of 79
FlexxPump 250 / 400 OLED
User manual
5.5. Start-up
Mount the FP 250/400 OLED carefully according to the steps described in chapters before.
Depending on the scope of delivery, you must also carry out the following additional measures for the
first-time start-up:
1. Check the assembly
Make sure that the FP 250/400 OLED is properly and completely assembled. In particular, the battery
must be inserted and a lubricant cartridge must be fitted.
2. Power on
If you want to put the FP 250/400 OLED into operation, switch on the FP 250/400 OLED. Only if you
switch the FP 250/400 OLED on, it delivers lubricant to the lubrication point according to the settings.
The detailed description for powering on can be found in chapter 6.3.1.
3. Activate filling menu
Execute the filling menu. The detailed description of this can be found in Chap. 6.3.5. The
FP 250/400 OLED thus carries out a pump cycle „PZ“ with a total of 40 lubrication strokes „C“ with the
activation.
4. Hydraulic connection
Connect the consumer hydraulically to the FP 250/400 OLED. If you connect tubes to the
FP 250/400 OLED, make sure that the tubes and connectors are installed tightly, cleanly and correctly.
Ideally, use tubes prefilled with the appropriate lubricant!
5. Check the settings on the FP 250/400 OLED
Check the factory settings of the FP 250/400 OLED with the required values for the lubrication point
and adjust them if necessary. Changes to the FP 250/400 OLED must be made in the Settings menu,
see Chap. 6.3.4.
Содержание FlexxPump 250 OLED
Страница 1: ...User manual FlexxPump 250 400 OLED ...