!
USER MANUAL – Release 1.2 of 01/01/2010
Page 20 of 191
Version: 02/03/2010
4.3
ANALOGUE INPUTS PB1 - PB10 CONFIGURATION
0. Disabled
1. Compressor 1 PTC discharge temperature probe
2. Compressor 2 PTC discharge temperature probe
3. Compressor 3 PTC discharge temperature probe
4. Compressor 4 PTC discharge temperature probe
5. Compressor 5 PTC discharge temperature probe
6. Compressor 6 PTC discharge temperature probe
7. Compressor 7 PTC discharge temperature probe
8. Compressor 8 PTC discharge temperature probe
9. Compressor 9 PTC discharge temperature probe
10. Compressor 10 PTC discharge temperature probe
11. Compressor 11 PTC discharge temperature probe
12. Compressor 12 PTC discharge temperature probe
13. Compressor 13 PTC discharge temperature probe
14. Compressor 14 PTC discharge temperature probe
15. Compressor 15 PTC discharge temperature probe
16. Compressor 16 PTC discharge temperature probe
17. Evaporator common input NTC temperature probe
18. Evaporator 1 output NTC temperature probe
19. Evaporator 2 output NTC temperature probe
20. Evaporator 3 output NTC temperature probe
21. Evaporator 4 output NTC temperature probe
22. Evaporator common outlet NTC temperature probe
23. Condenser hot water common input NTC temperature probe
24. Circuit 1 condenser hot water input NTC temperature probe
25. Circuit 2 condenser hot water input NTC temperature probe
26. Circuit 3 condenser hot water input NTC temperature probe
27. Circuit 4 condenser hot water input NTC temperature probe
28. Circuit 1 condenser hot water output NTC temperature probe
29. Circuit 2 condenser hot water output NTC temperature probe
30. Circuit 3 condenser hot water output NTC temperature probe
31. Circuit 4 condenser hot water output NTC temperature probe
32. Condenser hot water common output NTC temperature probe
33. System water inlet NTC temperature probe (free-cooling)
34. External air temperature NTC temperature probe (free-cooling)
35. Dynamic/boiler function/change over set-point external air temperature NTC temperature probe
36. Circuit n° 1 combined defrost NTC temperature probe
37. Circuit n° 2 combined defrost NTC temperature probe
38. Circuit n° 3 combined defrost NTC temperature probe
39. Circuit n° 4 combined defrost NTC temperature probe
40. Circuit n° 1 auxiliary outlet NTC temperature probe
41. Circuit n° 2 auxiliary outlet NTC temperature probe
42. Circuit n° 3 auxiliary outlet NTC temperature probe
43. Circuit n° 4 auxiliary outlet NTC temperature probe
44. Domestic hot water temperature control NTC temperature probe
45. Domestic hot water temperature safety NTC temperature probe
46. Discharge NTC temperature probe
47. Solar panel NTC temperature probe
48. Circuit 1 condensing temperature NTC probe
49. Circuit 2 condensing temperature NTC probe
50. Circuit 3 condensing temperature NTC probe
51. Circuit 4 condensing temperature NTC probe
52. Circuit n° 1 condensing pressure probe (4÷20 mA / 0÷ 5 Volt)
53. Circuit n° 2 condensing pressure probe (4÷20 mA / 0÷ 5 Volt)
54. Circuit n° 3 condensing pressure probe (4÷20 mA / 0÷ 5 Volt)
55. Circuit n° 4 condensing pressure probe (4÷20 mA / 0÷ 5 Volt)
56. Circuit n° 1 evaporating pressure probe (4÷20 mA / 0÷ 5 Volt)
57. Circuit n° 2 evaporating pressure probe (4÷20 mA / 0÷ 5 Volt)
58. Circuit n° 3 evaporating pressure probe (4÷20 mA / 0÷ 5 Volt)
59. Circuit n° 4 evaporating pressure probe (4÷20 mA / 0÷ 5 Volt)