
SK750/SK755 Operator’s Manual
Transport - 44
Haul
CMW
Haul
Load
1.
Disengage parking brake.
2.
Start engine.
3.
Adjust throttle to low speed.
4.
Pull lift arm control to raise mount plate (and attachment) clear of trailer, but keep it low.
5.
Move unit to rear of trailer and align with ramps.
6.
Drive forward slowly to move unit onto trailer until tiedown position is reached.
7.
Push lift arm control to lower mount plate (and attachment) to trailer bed.
8.
Engage parking brake.
9.
Ensure that all controls are in neutral position.
10. Turn ignition switch to STOP.
11. Tie down unit.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
To help avoid injury:
•
Load and unload trailer on level ground.
•
Incorrect loading can cause trailer swaying.
•
Attach trailer to vehicle before loading or unloading.
•
Only operate unit from operator platform.
•
To help prevent trailer sway, load trailer so that ten to fifteen percent of total vehicle weight
(equipment plus trailer) is on tongue.
•
If loading onto tilt-bed trailer, be prepared for trailer to tilt.
•
Move all controls to neutral position when stopped.
Содержание SK750
Страница 1: ...SK750 SK755 Operator s Manual 053 2570 Issue 1 0 Original Translation CMW...
Страница 11: ...Contents 11 SK750 SK755 Operator s Manual CMW...
Страница 21: ...Safety 21 SK750 SK755 Operator s Manual Emergency Procedures CMW...
Страница 38: ...SK750 SK755 Operator s Manual Drive 38 CMW Drive Chapter Contents Start Unit 39 Drive 39 Shut Down 41...
Страница 49: ...Transport 49 SK750 SK755 Operator s Manual Tow CMW...
Страница 73: ...Service 73 SK750 SK755 Operator s Manual As Needed CMW...
Страница 80: ......
Страница 81: ......
Страница 82: ...SK750 SK755 Operator s Manual Service Record 82 CMW Service Record Service Performed Date Hours...
Страница 83: ...CMW Service Record 83 SK750 SK755 Operator s Manual Service Performed Date Hours...